boomtruck-crane-lift-on-pipeline-1
28 ton boomtruck on pipeline
Boomtruck crane lift on pipeline construction project
230 feet of boom on RBC building Saskatoon
50 ton with jib building a cell tower at Rosthern SK
50 ton erecting cell pole with 28 as tail crane
Crane setup downtown saskatoon, installing counterweight
Building Hopper Bottom grain bins with 50 ton
Jack and Roll Job. 16,000 lb machine offloaded and placed inside building – pic 1
Jack and Roll Job. 16,000 lb machine offloaded and placed inside building – pic 2
Jack and Roll Job. 16,000 lb machine offloaded and placed inside building – pic 3
Erecting steel at Midtown Plaza Saskatoon with 110 ton
pole shed crane lift before
Before, adding 4 feet to pole shed by lifting with 2 cranes
pole-shed-crane-lift-2-after
After, adding 4 feet to pole shed by lifting with 2 cranes
I’ve been workin’ on the railroad 50 ton installing light tower
50 ton offloading scalehouse with spreader bar at its new location
Installation of smoke stacks at children’s hospital U of S with 110 ton crane
Placement of stack tower at children’s hospital U of S with 110 ton and 50 ton
Truck and trailer hauling equipment